Adams Avenue Sewer Replacement Project: Posted 11/6/2020
The work to be done for the base bid, in general, consists of construction and installation of an 8-inch sanitary sewer line, sanitary sewer manholes, sanitary sewer cleanout, sewer lateral, pipe trenching, backfill and resurfacing. All work shall be performed in accordance with the applicable portions of the Selma-Kingsburg-Fowler County Sanitation District Standards and Specifications latest revision and herein specified. Sealed bids will be received by the Selma-Kingsburg-Fowler County Sanitation District in their offices located at 11301 E. Conejo Avenue, Kingsburg, California 93631, at any time prior to 2:00 pm on November 24th, 2020.
Digital copies of the plans and specifications may be obtained by emailing the following information:
Company Name, Contact, mailing address, email, and telephone number to engineering@skfcsd.org.
Plans may also be inspected at the following locations:
862 Pollasky Avenue
Clovis, CA 93612
(559) 299-1544
1244 North Mariposa
Fresno, CA 93703
(559) 237-1831
PO Box 667
Visalia, CA 93279
(559) 732-4568